#TravelwithAllycaral 👒

🚄 India’s Bullet Train Dream Nears Reality: Full Corridor to Be Ready by December 2029


India is gearing up for its first-ever bullet train, and the finish line is in sight.

In a significant announcement, Railway Minister Ashwini Vaishnaw confirmed that the entire high-speed rail corridor from Maharashtra to Sabarmati (Gujarat) is expected to be fully completed by December 2029.

This corridor is part of the Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, the flagship initiative under India’s modernization of transport infrastructure.


🚄 Key Highlights:

  • Route: Maharashtra to Sabarmati, Gujarat
  • Length: Approximately 508 km
  • Speed: Up to 320 km/h
  • Trains: Based on Japanese Shinkansen (bullet train) technology
  • Completion Target: December 2029

Why It Matters:

The bullet train promises to cut travel time drastically, enhance regional connectivity, reduce road and air congestion, and serve as a symbol of India’s technological progress in public transport.

The project also marks significant Indo-Japanese collaboration, with both funding and technology support playing a crucial role in the corridor’s development.


What’s Next:

With work progressing steadily — including bridges, stations, and tunneling — the bullet train is no longer a distant dream. The 2029 deadline offers a clear timeline for what could become India’s most iconic transport upgrade of the decade.

Stay tuned as India inches closer to high-speed excellence.

📖 Read more stories like this on allycaral.com

#TravelwithAllycaral 👒

Japan to Introduce E10 Shinkansen Trains in Mumbai-Ahmedabad Bullet Train Corridor


India’s ambitious bullet train project just received a powerful boost. The Japanese government has officially agreed to introduce E10 series Shinkansen trains in India for the 508-km Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor, signaling a major step forward in Indo-Japanese infrastructure cooperation.

The E10 Shinkansen, a state-of-the-art model built for speed, comfort, and energy efficiency, is expected to significantly cut down travel time between Mumbai and Ahmedabad to just about 2 hours, a fraction of the current 7-8 hour journey.

This high-speed rail initiative, backed by Japan International Cooperation Agency (JICA), is part of India’s larger plan to revolutionize rail transport under the Make in India initiative. While the trains will be initially manufactured in Japan, future plans include technology transfer and local production.

Key Features of the Project:

  • Distance: 508 kilometers
  • Max Speed: 320 km/h
  • Stations: 12 stations between Mumbai and Ahmedabad
  • Trains: E10 Shinkansen with advanced safety, aerodynamic design, and noise reduction tech
  • Technology Partner: Japan, with support from JICA

The decision is expected to accelerate project timelines and bring India’s first high-speed rail corridor closer to operational reality. It also strengthens diplomatic and technological ties between India and Japan, showcasing a shared commitment to next-generation mobility and green transportation solutions.

With the groundwork already underway at various project sites, this announcement brings renewed momentum and global attention to one of India’s most transformative infrastructure projects.